159彩票

念海消防

检测充装

Problems with irregular inspection of fire cylinders

压力表掉压

The pressure drop in the fire-fighting gas cylinders and the insufficient pressure caused the fire extinguishing agent to be discharged normally, which hindered the fire-extinguishing efficiency.

消防气瓶内壁变薄

Corrosion of the inner wall of the bottle becomes thinner, and the leakage of the medicament results in the inability to extinguish the fire normally. There is a serious risk of explosion.

消防气瓶外壁锈蚀

The outside of the bottle body is corroded, and the wall thickness becomes thinner, which leads to the risk of leakage and explosion of the gas cylinder, which may cause serious casualties.

Fire cylinder inspection and filling process

  • 01

    Laws and regulations

  • 02

    Release of linkage with fire alarm control

  • 03

    Equipment disassembly and transportation

  • 04

    Fire cylinder inspection filling

  • 05

    Inspection filling information

  • 06

    Installation adjustment test

Consulting Hotline: 0512-67951790

Consult now
Nianhai Fire has been widely used in the fields of power, energy, coal mines, communications, finance, education, industrial plants, hotels, real estate and so on.
法律法规 Laws and regulations
Refer to "Cylinder Safety Technical Supervision Regulations"
Gas fire extinguishing system sevoflurane, carbon dioxide, ig541 are tested and filled every 3 years, and nitrogen bottles are tested and filled every 5 years.
2. Fire alarm lifted
The person in charge of construction and the main construction personnel went to the site to clarify the technical requirements for the construction, and removed the wiring from the solenoid valve. If the host alarms, press the mute key.
火警解除
设备拆装运输 3. Equipment disassembly and transportation
①Remove the starter bottle (or active bottle) starter copper tube nut, starter solenoid valve and circuit, and starter pipeline in order;
② Remove the high-pressure hose, pilot valve, put on the cap of the cylinder bottle, remove the hoop of the cylinder, remove the cylinder in order, and place the disassembled equipment in accordance with the specifications specified by Party A;
③ During the plane transportation process, special carts for cylinders should be used. The cylinder equipments are packed in groups by wooden pallets.
④ Keep the protective cover of the cylinder head valve intact to prevent accidental spray accidents during unloading and handling;
⑤ Arrange the forklift driver to unload and place the flat ground to prevent the cargo from falling over.

4. Fire gas cylinder inspection and filling
①Bottle valve disassembly
② Hydrostatic test
③Cylinder drying
④ Overhaul of bottle valve
⑤ Filling of medicine
⑥Airtightness test
⑦To be shipped

气瓶检测充装
检测充装资料 5. Filling information for fire gas cylinder testing
After the inspection and filling of the fire-fighting cylinders, our company will issue a regular inspection report of the fire-fighting cylinders, a list of regularly inspected qualified cylinders, a fire-extinguishing agent filling record form, and a quality guarantee.

6. Fire-fighting gas cylinders (sevoflurane, carbon dioxide, ig541) are returned to the site after filling and testing, and then they are installed and tested for acceptance.

安装调试验收

Complete qualifications

  • 气瓶检测许可证
  • 气瓶充装许可证
  • 危化品经营许可证
  • 建筑业二级资质证书
  • 安全生产许可证

They chose Nianhai Fire

念海消防七氟丙烷气瓶检测充装值得你选择!
Suzhou Heptafluoropropane Gas Cylinder Testing & Filling Service Case [Nianhai Fire Fighting]
Suzhou Culture and Art Center
The regular inspection and filling of fire-fighting sevofluropropane gas cylinders is stipulated in the National "Cylinder Safety and Technical Supervision Regulations". This project is a project of filling and testing of sevofluropropane gas cylinders implemented by Nianhai Fire Protection for Suzhou Culture and Arts Center.
念海消防气瓶检测充装服务更专业省心!
Nianhai Firefighting and China Unicom are connected because of fire gas cylinder detection
China Unicom Suzhou Branch
Fire gas fire extinguishing systems (commonly sevoflurane, IG541 and high pressure carbon dioxide fire extinguishing systems) are inspected every 3 years and nitrogen cylinders are inspected every 5 years. Fire cylinder inspection and filling project.
念海消防ig541气瓶检测充装更省心!
JD Cloud Data ig541 gas cylinder inspection and filling service case [Nianhai Fire]
JD Cloud East China Data Center 2019.12.20
There are rules and regulations for regular ig541 gas cylinder inspection and filling. This project is a ig541 gas cylinder inspection and filling project implemented by Nianhai Fire Protection for Jingdong Yunhua East Data Center. The Nianhai fire-fighting construction team is professional, careful and pragmatic, and willing to endure hardships. We are very satisfied.

Contact Nianhai

Suzhou Nianhai Fire Fighting Technology Co., Ltd.

手机:139-5110-6386 微信:13951106386 邮箱:sznianhai@163.com 公司地址:苏州市姑苏区福运路198号 Service Hotline: 0512-67951790 Mobile: 139-5110-6386 WeChat: 13951106386 Email: sznianhai@163.com Company Address: No. 198, Fuyun Road, Gusu District, Suzhou City
"Simple, sincere and kind are our business cards!"

Nianhai Fire Fighting

Focus on providing fire protection solutions in key protective areas 0512-67951790